
Package 03 · Your local extension · Your programme
Full De-risk Production Management
A local team in China. Not for one order, but for your entire production programme.
Ongoing · Retainer / framework*
Why you need it
China is a structural part of how you buy. Multiple suppliers, multiple orders in parallel or in sequence, and enough complexity that someone needs to be actively on the ground, following up, checking, communicating and escalating, across the programme rather than one order.
You have considered hiring locally, or already have someone stretched thin. Or the volume and risk of your China production simply justifies a dedicated local partner who knows your suppliers and standards and does not need briefing from scratch every time.

What it means
Full De-risk makes Scale Roads your local operational extension in China: for your programme, not one order. We maintain supplier relationships, set up new ones correctly, coordinate sampling across orders, follow up consistently, check quality at the right moments and step in when something goes wrong.
You get ongoing visibility, supplier discipline and practical problem-solving without building your own local team.
Build or buy?
Hiring for this yourself is costly in any market: salary, contributions, overhead and management time. And a hire at home still runs China from a desk abroad. A local hire in China adds HR, management bandwidth and the months it takes to build supplier relationships from scratch.
A Full De-risk retainer gives you a team that is already on the ground, already has the relationships and processes in place, and is accountable for results. The comparison is not service versus employee: it is local presence versus remote assumption.
What’s included, across your orders
Factory Audit
On-site assessment of new suppliers before they enter your programme: capacity, quality process, reliability.
Order Kick-off (every order)
Physical visit plus a signed bilingual (EN/CN) contract, every time. No order enters production on an assumption.
Sample Validation (every relevant sample)
Independent testing against the relevant standards, with a written assessment before bulk is released.
Recurring production follow-up
Across all active orders: consistent supplier pressure, not just when you remember to chase.
Physical Quality Check
At the right moment per order. Pre-shipment always; Pre-Production, During Production and Loading Supervision as needed.
Emergency Support (standard)
Not an add-on at this level. Part of how the partnership works. In an emergency we assess the situation on site, discuss solutions with the parties involved and give you clear options for next steps.
What you receive, across your programme
- Factory Audit reports for new suppliers entering the programme
- Bilingual (EN/CN) contracts and independent lab assessments for every order
- Interactive dashboard inspection reports per order
- Emergency situation reports with options, included
- Structured programme reporting: status, quality, supplier performance, risks
Pricing model
Retainer / framework*: a retainer or framework fee for a defined monthly or order-based scope, plus per-order fees for inspections, audits and kick-offs. For high-volume recurring orders, a per-container or per-order framework price can be agreed. Set upfront; add-ons transparently priced.
Boundary: Sourcing & supplier identification are not part of this package; available as a separate add-on on request.
* Pricing model, not a quote: the exact framework depends on programme scope (orders, suppliers, complexity) and is set per intake before any engagement starts.
Sourcing as an add-on
Sourcing as an additional step
Don’t have a suitable supplier for your product or product line yet? Before the Order Kick-off or production management begins, we can carry out supplier selection, shortlisting and price comparisons. This makes sourcing a logical first step towards a controlled production process.
Get in touch
Let us take a look at your supplier, order or biggest risk.
Together we determine whether an on-site service, a production control solution or structural local follow-up is the right fit.
